Winthrop Council Censures Aiello 8-1, Approves Seawall Engineering Phase Two

WINTHROP — February 25, 2025 — Winthrop Town Council censures Councilor Joseph Aiello 8-1 and approves $158,500 for seawall engineering. Council President James Letary introduced the formal censure resolution at the February 25 meeting, citing conduct "inconsistent with the highest standards of integrity, respect, and professionalism"; Aiello accepted the rebuke, saying "I was wrong. I felt awful about it. I need to be better." Public comment featured two residents calling the censure insufficient and one urging resignation. The council also unanimously approved Phase 2 engineering funding for flood mitigation at Tyleston, Girdlestone, and Pico streets — the second of four engineering phases in a $396,500 contract — on a positive recommendation from the Finance Subcommittee. An 8-1 vote adopted four amendments to the town tree ordinance, designating all public trees with a trunk diameter of 18 inches or greater as landmark trees and barring their removal for any non-town purpose. Town Manager Tony Marino reported Chelsea voted 11-0 to join Winthrop and Revere in a regional dispatch center, and the MBTA announced a direct Winthrop-Boston ferry route starting April 28 will cut commute time from roughly 50 minutes to about 20 minutes.

Keep reading with a 14-day free trial

Subscribe to The Winthrop MA Post to keep reading this post and get 14 days of free access to the full post archives.

Already have an account? Sign in. Ask about this instead

A subscription gets you:

  • Subscriber-only posts and full archive
  • Post comments and join the community
  • 24x7 access to local news

Subscribe to The Winthrop MA Post

Don’t miss out on the latest issues. Sign up now to get access to the library of members-only issues.
jamie@example.com
Subscribe

More local coverage: Suffolk County News · The Boston Post · The Chelsea Post · The Revere Post

Part of the Townbrief network — local government coverage for 350+ Massachusetts towns.